General construction work, installation of internal utilities
Roofing work:
• With rolled bitumen materials;
• Rolled polymer membranes.
Façade finish:
• Façade heat insulation;
• Façade finishing with decorative finishing plastering, facing brick, brick tile and ceramic granite, siding, façade cassettes, sandwich panels.
Interior finishing of office, residential and production premises.
Installation of water supply and sewerage, heating, ventilation and air-conditioning systems.
Our works:
• Complete overhaul of roofs with rolled bitumen materials for production premises, “Azovmash” Concern, Mariupol, 90 000 m2.
• Complete overhaul of roofs with rolled bitumen materials for production premises of refrigerator plant, JSC “Nord”, Donetsk, 25 000 m2.
• Complete overhaul of roofs with rolled bitumen materials of residential multi-storey buildings in Torez, 70 000 m2.
• Complete overhaul of roofs with rolled bitumen materials for administrative premises of the Department of Interior in Donetska Oblast, 15 000 m2.
• Complete overhaul of roofs with rolled bitumen materials for buildings of Department of Education in Donetska Oblast, 60 000 m2.
• Complete overhaul of Department of Education buildings in Donetska Oblast, Town of Amvrosiivka, Yenakievo, Donetsk, Pisky, total area of 27 000 m2.
• Complete reconstruction of “Militia Prompt Response Centre” building for the Department of Interior in Donetska Oblast, 3 000 m2.
• Complete overhaul of recreational facilities for employees of the Department of Interior in Donetska Oblast, 2 000 m2.
• Designing and construction of “Borys” Medical Centre in Donetsk, 1300 m2.
• Complete overhaul of premises for pretrial detention centre of Penitentiary Service Administration in Donetska Oblast, 1000 m2.
• Office buildings in Donetsk, total area of 20 000 m2.
• Complete overhaul of inside the house water supply and sewerage systems for residential multi-storey buildings in Torez.
• The water supply, sewerage, heating and air-conditioning systems have been installed during the comprehensive reconstruction of buildings.
•
The facades have been insulated and faced during the comprehensive reconstruction of buildings.
To front page